资源类型

期刊论文 390

会议视频 14

年份

2023 14

2022 34

2021 32

2020 22

2019 16

2018 32

2017 23

2016 36

2015 9

2014 13

2013 25

2012 11

2011 35

2010 16

2009 7

2008 19

2007 6

2006 4

2005 6

2004 8

展开 ︾

关键词

三峡工程 38

升船机 11

三峡升船机 10

项目管理 7

可持续发展 4

工程管理 4

全寿命周期 3

创新 3

工程项目 3

施工技术 3

2021全球十大工程成就 2

企业 2

决策支持 2

决策支持系统 2

升船机塔柱 2

工程成就 2

工程项目管理 2

投资决策 2

桥梁隧道 2

展开 ︾

检索范围:

排序: 展示方式:

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

《工程管理前沿(英文)》 2014年 第1卷 第4期   页码 353-357 doi: 10.15302/J-FEM-2014051

摘要: Traditional project management often ignores problems arising after project completion such as value changing, functional decline, waste of resources and environmental pollution during the operation and dismantling process. This paper advances the concept of “post-project”, builds a framework for post-project management with case analysis, as the social development and new requirements for project management by environmental protection. Post-project refers to a project which no longer possesses normal value, because of loss after use, inability to adapt to new requirements, artificial destruction, damage beyond control, and deprivation of value after the completion of the project. Post-project management encompasses a series of management and technical activities including updating, reforming, removal, recovery, and recycling. The process of post-project management is composed of classification and characteristics of post-projects, management decisions, implementation, and evaluation. Post-project management can realize the sustainable development of project and society.

关键词: project management     life cycle     project update     project remake     project removal     project restoration     project recycling    

An update and cumulative meta-analysis

null

《医学前沿(英文)》 2014年 第8卷 第2期   页码 241-249 doi: 10.1007/s11684-014-0328-0

摘要:

Approximately 70% of newly diagnosed bladder tumors are non-muscle invasive bladder cancer (NMIBC). NMIBC accounts for approximately 80% of total bladder cancer cases. Bacillus Calmette-Guérin (BCG) instillation and maintenance is considered as the standard adjuvant treatment for superficial bladder cancer. A number of randomized studies have focused on the benefit of maintenance therapy following initial BCG induction. To provide further insights into the effect of intravesical instillation on recurrence in patients with NMIBC, we analyzed this relationship by conducting an updated detailed meta-analysis. Evidence suggested that adjuvant intravesical BCG with maintenance treatment is significantly effective for the prophylaxis of tumor recurrence in patients with NMIBC.

关键词: non-muscle invasive bladder cancer     bacillus Calmette-Guérin (BCG)     meta-analysis    

Update on Mayer–Rokitansky–Küster–Hauser syndrome

《医学前沿(英文)》 2022年 第16卷 第6期   页码 859-872 doi: 10.1007/s11684-022-0969-3

摘要: This review presents an update of Mayer–Rokitansky–Küster–Hauser (MRKH) syndrome on its etiologic, clinical, diagnostic, psychological, therapeutic, and reproductive aspects. The etiology of MRKH syndrome remains unclear due to its intrinsic heterogeneity. Nongenetic and genetic causes that may interact during the embryonic development have been proposed with no definitive etiopathogenesis identified. The proportion of concomitant extragenital malformations varies in different studies, and the discrepancies may be explained by ethnic differences. In addition to physical examination and pelvic ultrasound, the performance of pelvic magnetic resonance imaging is crucial in detecting the presence of rudimentary uterine endometrium. MRKH syndrome has long-lasting psychological effects on patients, resulting in low esteem, poor coping strategies, depression, and anxiety symptoms. Providing psychological counseling and peer support to diagnosed patients is recommended. Proper and timely psychological intervention could significantly improve a patient’s outcome. Various nonsurgical and surgical methods have been suggested for treatment of MRKH syndrome. Due to the high success rate and minimal risk of complications, vaginal dilation has been proven to be the first-line therapy. Vaginoplasty is the second-line option for patients experiencing dilation failure. Uterine transplantation and gestational surrogacy are options for women with MRKH syndrome to achieve biological motherhood.

关键词: MRKH (Mayer–Rokitansky–Küster–Hauser) syndrome     etiology     clinical characteristic     diagnosis     treatment     psychological effect    

利用改进粒子群求解TSP 问题的一种新方法

成伟明,唐振民,赵春霞,陈得宝

《中国工程科学》 2008年 第10卷 第7期   页码 165-168

摘要:

借鉴蚁群算法中的信息素机制,并利用粒子群算法操作简单、易于实现、计算量小的特点,给出一种 新的求解TSP问题方法。对基本粒子群算法进行了改进,针对多样性下降导致的局部最优问题,设计了一种 自动调节机制。根据群体适应度的差异计算多样性,并在群体多样性下降到一定程度时,随机退化部分适应 值较高的粒子,增强群体的多样性。通过对旅行商问题的对比实验验证了该方法的有效性。

关键词: 信息素     粒子群优化     旅行商问题    

用航空航天影像更新地形图地物要素的栅格化方法

林宗坚

《中国工程科学》 2000年 第2卷 第4期   页码 43-47

摘要:

文章针对当前我国1:5和1:1万地形图更新的大规模生产的迫切需求,提出在原有地形图栅格式数字化的基础上,叠加经过精密纠正配准的航空或卫星遥感影像,以栅格方式更新地物要素的全过程方法。文中特别阐述了:1)地形图栅格数字化不同于矢量数字化的扫描采样分辨率问题;2)区别于传统的“针孔式”控制点概念的图像图形阵列控制点技术;3)由于DEM(数字高程模型)数据缺乏或精度不足引起的航空航天影像与地形图图形配准误差的局部纠正方法;4)定性指导定量的影像判读方法;5)从遥感影像提取地物结构信息的半自动化方法。文章最后列出

关键词: 测绘遥感     地形图更新     数字栅格地图    

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

《工程管理前沿(英文)》 2022年 第9卷 第2期   页码 221-238 doi: 10.1007/s42524-022-0195-3

摘要: A project is a specific effort to create a unique product, so it is a favorable place for knowledge creation and development. Knowledge can be transferred inside and outside projects and their parent project-based organizations, thus affecting project performance and organizational competitiveness. However, the current research on the elements and outcomes of knowledge transfer (KT) in the project environment lacks completeness and clarity, and that on the different levels of KT is fragmented. This study aims to conduct comprehensive research to determine and link the elements and outcomes of KT in the project environment. The authors systematically analyzed the relevant literature from 2000 to 2021, which showed an increasing publication trend. They divided KT in the project environment into three levels according to the transfer scenario: Intra-project, cross-project, and cross-organizational KT. Five-dimensional transfer elements and two-dimensional transfer outcomes were then identified and analyzed from previous literature. Lastly, the relationships between the transfer elements and outcomes were gathered to create a comprehensive model. Importantly, the knowledge gap in the current literature was highlighted, and future research directions were put forward. This study builds a theoretical framework linking transfer elements to outcomes that can serve as a basis for scholars and practitioners to develop effective strategies for KT in the project environment.

关键词: knowledge transfer     knowledge management     project management     project environment     literature review    

Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project

Zhen-you Li,Ji-shan He,Meng-jun Wang

《工程管理前沿(英文)》 2016年 第3卷 第3期   页码 231-238 doi: 10.15302/J-FEM-2016032

摘要: Modern international project management has entered the phase of precise and accurate project management after the global financial crisis broke out at the beginning of the 21 century. However, its development has faced new challenges since there has been lack of explicitly unanimous definition for the capability dimensions of precise and accurate project management, as well as the models and their process control parameters. The required core capabilities based on the precise and accurate project management for various rings are involved in the project life cycle, namely, the required internationally core competences and their components for the phases of project strategic planning and decision making in the early project phase, as well as the value engineering, and the project supervision and controls during the execution phase. Through studying the effects of the internationally core competences based on precise and accurate project management capabilities for the success and excellence of projects and configuring such models, the goal is to help the main contractors continuously obtain project success and excellence, thus improve its internationally core competences with continuous project success and excellence.

关键词: precise and accurate project management     project strategic planning     decision-making     project supervision and controls     project execution     value engineering    

项目业绩系统评价模型及其改良研究

利镇有,何继善

《中国工程科学》 2011年 第13卷 第8期   页码 10-14

摘要: 通过排除一些评估过程中易于产生歧义的复杂方法和手段,对国际项目管理协会(IPMA)所广泛采用的项目卓越模型(project excellence model, PE模型)进行改良,提出更为合理和透明简约的模型和手段

关键词: 项目评价     项目管理     项目卓越模型     项目知识管理    

A Study of the Functional Mechanism of Petrochemical Engineering Construction Project Management

Ji-ming Wang

《工程管理前沿(英文)》 2014年 第1卷 第2期   页码 129-139 doi: 10.15302/J-FEM-2014020

摘要: This paper, proceeding from the project construction process, the management mode and the implementation way, makes an in-depth study of the environmental characteristics and the managerial elements of petrochemical engineering construction project, revealing the inherent laws, establishing a theoretical model, and proposing a theory of the mechanisms of construction project management; and presents profound revelations found for construction project management in petrochemical engineering in seven aspects, which can play a guiding role in improving the managerial performance of petrochemical construction project. The theory established proposes that: The construction project management in petrochemical engineering is a complex systematic process, formed of 5 phases and 55 sub-processes of management, and exposed to many factors of influence; the environmental characteristics and managerial elements exercise positive impacts on managerial performance, but different factors have different impacts and act in different ways on managerial performance; the managerial elements of petrochemical engineering construction project are tiered, transferable, systematic and quantifiable, and the role of managerial elements in the managerial performance can be systematically integrated, quantitatively explained and transferred in a multi-level way.

关键词: petrochemical engineering     construction project     project management     functional mechanism    

Organizational evolution of project management teams over the whole lifecycle of megaprojects: Case study

《工程管理前沿(英文)》   页码 439-454 doi: 10.1007/s42524-022-0211-7

摘要: Project management teams are critical in the implementation of megaprojects, but their evolution throughout the project lifecycle has not been clearly explained. This paper explores the organizational evolution of megaproject management teams through a longitudinal retrospective case study of the Hong Kong–Zhuhai–Macao Bridge (HZMB) project. The organizational evolution is examined in terms of management objectives, management content, and organizational structure. The organizational evolution of the HZMB project management team exhibits stage differentiation with the coexistence of turbulence and stability. Changes in the external environment are the driving force for organizational evolution, whereas a flexible organizational strategy is critical in promoting this evolution. Basing on the HZMB case study, this paper summarizes six critical measures that facilitate the organizational evolution of megaproject management teams. Our findings add value to megaproject management theory and provide a better understanding of the dynamics and complexity of megaproject organizational management.

关键词: megaproject     organizational evolution     whole lifecycle management     project management team    

Hybrid genetic algorithm for bi-objective resource-constrained project scheduling

Fikri KUCUKSAYACIGIL, Gündüz ULUSOY

《工程管理前沿(英文)》 2020年 第7卷 第3期   页码 426-446 doi: 10.1007/s42524-020-0100-x

摘要: In this study, we considered a bi-objective, multi-project, multi-mode resource-constrained project scheduling problem. We adopted three objective pairs as combinations of the net present value (NPV) as a financial performance measure with one of the time-based performance measures, namely, makespan ( ), mean completion time (MCT), and mean flow time (MFT) (i.e., min /max , min /max , and min /max ). We developed a hybrid non-dominated sorting genetic algorithm II (hybrid-NSGA-II) as a solution method by introducing a backward–forward pass (BFP) procedure and an injection procedure into NSGA-II. The BFP was proposed for new population generation and post-processing. Then, an injection procedure was introduced to increase diversity. The BFP and injection procedures led to improved objective functional values. The injection procedure generated a significantly high number of non-dominated solutions, thereby resulting in great diversity. An extensive computational study was performed. Results showed that hybrid-NSGA-II surpassed NSGA-II in terms of the performance metrics hypervolume, maximum spread, and the number of non-dominated solutions. Solutions were obtained for the objective pairs using hybrid-NSGA-II and three different test problem sets with specific properties. Further analysis was performed by employing cash balance, which was another financial performance measure of practical importance. Several managerial insights and extensions for further research were presented.

关键词: backward–forward scheduling     hybrid bi-objective genetic algorithm     injection procedure     maximum cash balance     multi-objective multi-project multi-mode resource-constrained project scheduling problem    

Analysis of synergy degree and its influencing factors in hydropower EPC project management

Jiwei ZHU, Hua GAO, Jiangrui WANG

《工程管理前沿(英文)》 2021年 第8卷 第3期   页码 402-411 doi: 10.1007/s42524-020-0098-0

摘要: The use of engineering procurement construction (EPC) mode is currently a trend in hydropower engineering construction. The clarification of the internal relationship between hydropower EPC projects and the realization of synergy has great significance in improving management efficiency and implementation effect. In this work, a three-dimensional system and a system model of hydropower EPC project management synergy are constructed. The mechanism and factors that influence the degree of management synergy are analyzed on the basis of management synergy theory. Furthermore, the evaluation index system and the degree of synergy model are established, and grey relational analysis is utilized to identify the key factors that affect the synergy degree. Thus, this study aims to facilitate the hydropower EPC project management synergy, provide a quantitative method for synergy degree evaluation, and propose corresponding promotion strategies. Results show that the order degree of each subsystem presents a steady upward trend. Specifically, the order degree of the subsystem at the trial operation stage is low, which is the major restriction on the further improvement of the synergy degree of EPC project management. The key factors in improving the synergy level of hydropower EPC project management are mainly concentrated in the information and organization synergy subsystems, including the construction degree of information platform, the performance of functions, the timeliness of information transfer, and the functions of the information platform.

关键词: hydropower project     EPC mode     synergy degree model     grey relational analysis    

The Environmental Impact of the Three Gorges Project and the Countermeasures

You-mei Lu,Cun-liang Shang

《工程管理前沿(英文)》 2014年 第1卷 第2期   页码 120-128 doi: 10.15302/J-FEM-2014019

摘要: The Three Gorges Project (TGP) is a landmark Chinese hydroelectric project with the goal of harnessing the Yangtze River and developing its water resources. Because of its enormous size and far-reaching influence, the project’s impact on the Yangtze River’s original ecological environment has been a concern to many people. This article examines the environmental effects of TGP with regard to reservoir-induced seismicity and bank stability, climate changes, sedimentation and bank erosion, the protection of aquatic species and water quality, and resettlement. Based on the operation monitoring data of TGP in 10 years (2003—2012), this article analyzes the tendency of reservoir-induced seismicity and bank stability, developing trend of sedimentation and bank erosion, the interplay between climate change and TGP, the distribution and cause of water contamination, the situation of aquatic species’ protection and living situation of resettled residents. At the same time, this article lists the comprehensive benefits of TGP in flood control, power generation, shipping, water supply, energy conservation and emission reduction. In the end, the authors deem that there is a dynamic and harmonious relationship between humankind and nature. The cognition about TGP will be progressed in practice, and harmonious relationship between the environment and TGP will be achieved through more practice.

关键词: the Three Gorges Project     ecosystem     aquatic species     water quality     flood control     disaster alleviation     energy saving     emission reduction    

Demonstration project of safe and efficient mining operations in extra-thick coal seam

Jinhui WANG

《工程管理前沿(英文)》 2017年 第4卷 第1期   页码 110-110 doi: 10.15302/J-FEM-2016063

摘要:

业务架构集成中的企业级业务组件识别方法 Article

Jiong FU, Xue-shan LUO, Ai-min LUO, Jun-xian LIU

《信息与电子工程前沿(英文)》 2017年 第18卷 第9期   页码 1320-1335 doi: 10.1631/FITEE.1601836

摘要: Department of Defense Architecture Framework)模型对业务组件进行了定义和形式化描述,为了对业务组件进行定量化分析,将业务模型转为一个CRUD(create, read, update

关键词: 业务架构集成;业务组件;组件识别;CRUD矩阵;启发式    

标题 作者 时间 类型 操作

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

期刊论文

An update and cumulative meta-analysis

null

期刊论文

Update on Mayer–Rokitansky–Küster–Hauser syndrome

期刊论文

利用改进粒子群求解TSP 问题的一种新方法

成伟明,唐振民,赵春霞,陈得宝

期刊论文

用航空航天影像更新地形图地物要素的栅格化方法

林宗坚

期刊论文

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

期刊论文

Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project

Zhen-you Li,Ji-shan He,Meng-jun Wang

期刊论文

项目业绩系统评价模型及其改良研究

利镇有,何继善

期刊论文

A Study of the Functional Mechanism of Petrochemical Engineering Construction Project Management

Ji-ming Wang

期刊论文

Organizational evolution of project management teams over the whole lifecycle of megaprojects: Case study

期刊论文

Hybrid genetic algorithm for bi-objective resource-constrained project scheduling

Fikri KUCUKSAYACIGIL, Gündüz ULUSOY

期刊论文

Analysis of synergy degree and its influencing factors in hydropower EPC project management

Jiwei ZHU, Hua GAO, Jiangrui WANG

期刊论文

The Environmental Impact of the Three Gorges Project and the Countermeasures

You-mei Lu,Cun-liang Shang

期刊论文

Demonstration project of safe and efficient mining operations in extra-thick coal seam

Jinhui WANG

期刊论文

业务架构集成中的企业级业务组件识别方法

Jiong FU, Xue-shan LUO, Ai-min LUO, Jun-xian LIU

期刊论文